Cité Rey, Arijs & Hydrogen Europe

Cité Rey, Arijs & Hydrogen Europe 900 675 Europlafond sa - Eurocloison®

1. Cité Rey Nursing Home – Braine-le-Comte

Provisional reception of the Cité Rey Nursing Home site in Braine-le-Comte which was entrusted to us in May by Entreprises Générales Louis Duchêne to install partitions and suspended ceilings.
The supporting residence, Sé-Rey-nité, was opened on 7 March.
These are 32 apartments, each of 53m² which will be available to residents.
The supporting residence named Sé-Rey-Nité, very close to Cité Rey.

Start of works

Start of June 2019

End of works

Start of March 2020

Description of works

  • Fitting of EI 60 plasterboard suspended ceilings – 1020m²
  • Fitting of Thermogyp type thermoacoustic partitions – 1755m²
  • Fitting of Rockfon Krios suspended ceilings – 825m²
  • Installation of MS100A partitions – 486m²

2. Undertaker Arijs – Alost

We are finishing the project at the undertaker Arijs in Alost. The interior finishing of the funeral parlour, as well as the adjoining house was entrusted to us by Botech.

The project was carried out in 2 phases, so that the client could also live and work on the site. The building has a total surface area of 780m². The opening of the new building took place in March 2020.

Start of works

September 2019

End of works

March 2020

Our works

Interior finishing of the funeral parlour, as well as the adjoining house

Description of works

  • Fitting of the plasterboard suspended ceilinge
  • Erecting of plasterboard walls
  • Installation of trunking for lights and various plasterboard finishing
  • Fitting of the mineral fibre tile suspended ceiling

3. Hydrogen Europe – Brussels

Just before the start of Europlafond’s holidays, the company registered the order to plan for new offices at HYDROGEN EUROPE.

Start of works

December 2019

End of works

March 2020

Our works

Planning of new offices at Hydrogen Europe.

Description of works

  • Adaptation and planning of suspended ceilings with integrated lighting
  • Erecting of full-height solid, glazed partitions (2.60m), acoustic barriers to the right of the partitions, full-height safety glass doors (9 rooms), mobile partition
  • Electricity
  • HVAC: installation of a two-way flow with supply and return
  • Fire resistance subdivision
  • Planning of a small kitchen with electric equipment
  • Floor covering
  • Painting
  • Bespoke furniture
Privacy policy

To ensure the proper functioning of this site, we sometimes need to save small data files on the equipment of our users. Most websites do the same.

What's a cookie ?

A cookie is a small text file that websites save on your computer or mobile device when you visit them. It allows these sites to memorize your actions and preferences (user name, language, font size and other display parameters) for a given time, so that you do not have to indicate this information each time you consult these sites or navigate from page to page.

See here our privacy policy

Click here to enable / disable Google Analytics

We use cookies to improve your experience on our website. By browsing this website, you agree to our use of cookies.